Phase 3, Symmetry Park Bicester, Morrell Way, Bicester, OX26 6GF
40,000 to 270,000 Sq Ft / Industrial / General Industrial
To Let
Available - Last updated: 19 November 2024
Summary
Extending to a total of 69 acres, Symmetry Park, Bicester has the capacity to deliver up to 963,000 sq ft of logistics floor space.
Phase 3 accommodates up to 270,000 sq ft of logistics floor space. For more information, download the masterplan below.
Phase 2: Unit D (60,000 sq ft) has been pre-let to DPD Group UK Ltd. The distribution hub is the first net zero carbon in construction building in the Tritax portfolio. Learn more here.
Phase 1: Unit A1 (88,000 sq ft) was pre-sold to Bentley Designs Ltd with Unit A2 (110,000 sq ft) developed speculatively and subsequently sold to Medline Services Ltd. Unit B (163,664 sq ft) was developed speculatively and let to Ocado Retail Ltd. Unit C (271,227 sq ft) was developed speculatively and let to Syncreon Technology UK Ltd (DP World Logistics).
We have made a significant commitment to the environment to deliver all new buildings to net zero carbon in construction. More information can be found here.
Key Points
Established logistics parkExcellent access to M40 J9Building built to net zero carbon in constructionBREEAM Very Good and aboveEV car chargingFloor loading minimum 50kN/m2Available on a Build to Suit basisLocation
Strategically located close to junction 9 of the M40 (4 miles / 10 minutes), benefiting from direct frontage to the A41, with excellent access to London, Birmingham and the national motorway network.
Property Quote Price(s)
Description | Sale type | Guide price | Price type |
POA |
To Let
|
NA
| NA |
Email me updates about similar new properties
Show similar properties