Six St Andrew Square is a prime, mixed-use building at the heart of Edinburgh, capable of accommodating office requirements of up to 116,755 sq ft.
A building of cutting edge design providing modern Grade A offices over second to sixth floors.
The office accommodation is accessed from ground floor through a grand, double-height entrance that extends into the reception area, with a view through to the central seven storey atrium base and double-height lift lobby beyond.
Location
6 St Andrew Square occupies a prominent 100% prime office location on the south side of St Andrew Square in Edinburgh’s traditional commercial core. The location is well served by city centre amenities with restaurants, bars, retail and both budget & luxury hotels all within close proximity. St James Quarter immediately to the east of St Andrew Square provides a 1.7 million sq ft mixed use scheme comprising retail, leisure, hotel, restaurant, cinema and residential units.
St Andrew Square is well served by public transport with the Edinburgh bus station just across the square. There is also a regular tram service to Edinburgh Airport operating on the square. Edinburgh’s principal railway station, Waverley, is also approximately 300 meters to the South.
Accommodation
6th Floor - 15,517 sq ft (1,442 sq m) - 4 car parking spaces - 3 terraces (2,312 sq ft)
5th Floor - 23,795 sq ft (2,211 sq m) - 3 car parking spaces
4th Floor - 23,410 sq ft (2,175 sq m) - 3 car parking spaces - 1 terrace (567 sq ft)
3rd Floor - 23,902 sq ft (2,221 sq m) - 3 car parking spaces
2nd Floor - 23,917 sq ft (2,222 sq m) - 3 car parking spaces
Ground Floor Reception - 2,428 sq ft (225 sq m)
Retail - 3,786 sq ft (351 sq m)
Total - 116,755 sq m (10,847 sq m) - 16 car parking spaces - 4 terraces
Terms
Terms - Available on application
EPC Rating - A(3)
Specification
- Designed to BREEAM "Very Good" and EPC A, 6 St Andrew Square also has the following sustainable features:
- Sedum roof assists with water run-off and supports urban biodiversity
- Rainwater harvesting from "brown roof" utilised in all WC and urinal flush systems to reduce excess water consumption
- Heating and cooling is provided by an air source heat pump system
- LED lighting levels are set through sensor and occupant control & run at reduced operations to extend operational lift
- Smart metering installed and metered on a floor by floor basis
- Building designed to support 100% recycling