Since acquiring the park, Frogmore has masterplanned and secured consent for a complete makeover of the development on a phased basis. The first phase of the transformation comprised construction of a new security gatehouse, extensive alterations to the hard and soft landscaping, improvements to the estate road, new lighting and new signage. The latest phase of the work has been the comprehensive refurbishment and extension of Buildings 4, 7 & 8 at the entrance to the park together with a new café facility to serve the entire development.
Planning permission has been granted for the substantial strip-back-to-the-frame refurbishment of the existing building. The new refurbished building will total approximately 39,602 sq ft net for the following:
BUILDING 5
1st Floor 19,964
Gd 19,638
Total 39,602 sq ft
113 car spaces (1:350 sq ft NIA)
The above areas are approximate Net Internal and subject to on site verification.
Specification
• VRF air conditioning
• Metal tiled suspended ceiling with LG7 compliant lighting
• Raised floors – 150mm overall (180mm at ground level)
• Finished floor to ceiling heights 2600mm
• 1.5m planning module
• 8 person passenger lift
• BREEAM ‘Very Good’ rating targetted
• Skylights over first floor office and entrance
• Cycle racks
• CCTV, video entry and door access control systems
Since acquiring Foundation Park, Frogmore has also implemented a comprehensive makeover of the park’s amenities.
Location
Maidenhead, Berkshire Foundation Park is located on the western side of the town and enjoys excellent infrastructure links to the M4 and M40 motorways via the nearby by A404 (M). The park is located only thirty miles west of Central London and only fourteen and fifteen miles from the M25 orbital motorway and London Heathrow Airport respectively.