The building is arranged over five floors and benefits from open plan layouts, raised access flooring, air conditioning and suspended ceilings with recessed category II lighting.
Location
Swindon is a major commercial centre, situated on the M4 corridor with Bristol approximately 40 miles to the West via Junction 16 and London 80 miles to the East via Junction 15. The Town is home to many national and international companies including Honda, BMW Mini, Intel, Motorola and Nationwide Building Society. The aptly named Focal Point is a modern, elegant detached building situated in a prime location in the very heart of Swindon Town Centre and Business District only two minutes walk from Swindon Railway Station and adjacent to the town centre redevelopment area known as Kimmerfields.
Accommodation
Ground Floor Reception 700 sq ft (65.0sq m )
Ground Floor Store 1,230 sq ft (114.2 sq m)
Ground Floor Office 2,700sq ft ( 250.8 sq m )
First Floor 7,400 sq ft (687.5 sq m )
Second Floor 7,400 sq ft (687.5sq m )
Third Floor 7,400sq ft ( 687.5 sq m )
Fourth Floor 7,400 sq ft (687.5sq m )
TOTAL 34,230sq ft ( 3,180sq m )
Terms
The property is available as a whole or on a floor by floor basis on new effective full repairing and insuring terms via service charge, direct with the landlord
BuSINESS RATES Interested parties should make their own enquiries with the local billing authority, Swindon Borough Council on 01793 445500, to ascertain the exact rates payable. A change in occupation may trigger an adjustment of the rating assessment.
LEGAL COSTS Each party is to be responsible for their own legal costs incurred in the transaction.
ENERGY PERFORMANCE CERTIFICATE The energy performance certificate rating is C (55) and is available for inspection
Specification
- Staffed Reception.
- New 1Gb fibre internet bearer.
- Secure access and new high definition 24 hour CCTV.
- Additional New Meeting rooms and Business Centre on first floor.
- 2 large DDA compliant lifts with Brand New lift cars.
- New male and female toilets on each floor.
- New disabled toilet on ground floor.